• English /
  • Latviešu /
  • Русский

News

12.09.2011
LLC RIGA FERTILIZER TERMINAL (RFT) has obtained positive opinions from all required governmental institutions and experts and is planning to build the most advanced and safe fertilizer handling and temporary storage terminal in Northern Europe in Kundziņsala, within the territory of the Riga Port, by the beginning of 2014. The planned handling capacity of the terminal is 2 million tons of cargo annually.
10.08.2011
Riga Central Terminal LLC (RCT) has handled the first capesize vessel, the MV Nord Pisces, in the history of Riga port. A total of 93,500 tons of coal was loaded onto the carrier.
19.07.2011
Riga Commercial Port LLC (RTO) corporate group’s company Riga Container Terminal LLC is raising its share capital to 220,000 lats.
2012-01 2012-03

February 2012

M T W T F S S
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29